ETHX Softcon
Domain Tool

Manufacturing Portal.

Shop-floor execution, OEE, WIP, and quality in a single glass — tightly integrated with Oracle Manufacturing Cloud and EBS.

What We Do

One glass for the shop floor.

Operators, supervisors, and plant managers don't want seven tools. The ETHX Manufacturing Portal unifies execution, visibility, and quality on one Fusion-native surface — and writes back to Oracle in real time.

  • Operator consoles for starts, completes, scrap, and labour
  • Supervisor dashboards for dispatch, exceptions, and OEE
  • Plant manager KPIs for throughput, yield, and downtime
  • Native write-back to Oracle Mfg Cloud and EBS WIP

What is the ETHX Softcon Manufacturing Portal for Oracle Manufacturing Cloud?

The ETHX Softcon Manufacturing Portal is a shop-floor experience layer that brings execution, OEE, WIP, scrap, and quality into a single view on top of Oracle Manufacturing Cloud or E-Business Suite WIP, writing back to Oracle natively rather than acting as a separate MES. It provides role-based consoles: operators record operation starts and completes, labour, material issue, scrap, and rework; supervisors manage dispatch, queues, priorities, and exceptions across work centres; and plant managers track throughput, yield, and downtime with KPI drill-downs.

OEE is measured across availability, performance, and quality with reason codes and root-cause tagging. Quality features include inspection checklists, non-conformance capture, and a disposition workflow. PLC and SCADA signals can be captured through OPC UA and Oracle Integration Cloud adapters, and critical operator screens support offline mode with automatic sync. Opt-in AI assistants help with OEE triage and downtime root cause. ETHX Softcon states that a typical single-plant rollout takes 6–10 weeks, including integration and training, starting with a pilot on one line or cell.

What should you evaluate before adding a shop-floor portal to Oracle Manufacturing?

Start by deciding which system owns each shop-floor transaction, and what Oracle already provides, before choosing screens. The ISA-95 standard describes the boundary between level 4 business systems such as ERP and level 3 manufacturing operations systems. Using it to list what crosses that line, typically work orders and resources going down and completions, labour, scrap and material consumption coming back, prevents two systems from each believing they hold the true quantity. Oracle Manufacturing can also synchronise resources and work orders to Oracle Production Monitoring, so check what the standard stack covers before paying for a separate layer.

Agree how OEE is calculated before building dashboards. OEE multiplies availability, performance and quality, but every factor hides a choice: whether planned downtime reduces availability, which rate counts as ideal speed, and whether reworked units count as good. Oracle's documentation, for example, measures availability against scheduled time and accounts for planned and unplanned downtime events. If plants use different conventions, line-to-line comparisons are misleading, so write down the formula, the time base and the downtime reason codes, and apply them everywhere.

Then look at machine connectivity and the operator's working conditions. Where signals come from PLCs or SCADA, an open protocol such as OPC UA, which includes authentication, encryption and auditing, is generally easier to secure and maintain than one-off drivers. Decide what happens when the network or ERP is unavailable, because production does not stop, and how queued transactions are reconciled afterwards. Screens need to work with gloves, shared terminals and shift handovers. A pilot on a single line with real operators usually exposes these issues sooner than design workshops do.

Capabilities

What the portal does.

Shop Floor Execution

Operation starts/completes, labour capture, material issue, scrap, rework.

OEE & Downtime

Availability, performance, quality — with reason codes and root-cause tagging.

Dispatch & Scheduling

Supervisor view of queue, priorities, and exceptions across work centres.

Quality

Inspection checklists, non-conformance capture, disposition workflow.

Plant Dashboards

Throughput, yield, downtime, and KPI drill-downs for plant managers.

PLC / SCADA Integration

OPC UA and OIC adapters for real-time signal capture and feedback.

How We Deliver

How we roll out the portal.

Step 01
01

Gemba

Shop-floor walk, operator interviews, pain-point inventory.

Step 02
02

Configure

Map screens to roles, wire work definitions, configure OEE reasons.

Step 03
03

Integrate

Oracle Mfg Cloud / EBS write-back, PLC / SCADA signal capture.

Step 04
04

Pilot

One line or cell with real operators for 2–4 weeks.

Step 05
05

Scale

Plant-by-plant rollout with training in-shift, in-language.

Why ETHX

Why manufacturers pick our portal.

Built by consultants who walk the gemba — not designed from a desk

Fusion-native write-back — no shadow data, no reconciliation headaches

Role-based consoles for operator, supervisor, and plant manager

Shop-floor assistant AI baked in (OEE triage, downtime root cause)

Works alongside (not against) Oracle Mfg Cloud and EBS

Delivered across automotive, engineering, and food & beverage

Case Study
Automotive · 3 plants

+12 OEE points in 10 weeks across three plants

Portal + PLC integration gave operators, supervisors, and plant managers live OEE and downtime root causes.

+12 pts OEE

* Illustrative example based on ETHX Softcon delivery experience — client anonymised

Automotive · 3 plants
FAQ

Manufacturing Portal — frequently asked questions

No — it sits on top of Oracle Mfg Cloud (or EBS WIP) and writes back natively. It's a shop-floor experience layer, not a separate MES.

Last reviewed:

Bring Oracle onto the shop floor.

Book a demo — we'll show live operator, supervisor, and plant-manager views in 30 minutes.